The datascopes with the metal framed base had a Mainboard in that base. When I went to work with Entrex in Nashville in 1975 the terminal had it's "works in a drawer" where the control box was located in the left drawer of the desk which was a part of every workstation.
Barry, that's fascinating, thank you for sharing! So, if I follow this correctly, the "terminal-in-a-desk" model shown here https://bit.ly/2Kuig5Z has the upper left drawer full of the system boards?
The datascopes with the metal framed base had a Mainboard in that base. When I went to work with Entrex in Nashville in 1975 the terminal had it's "works in a drawer" where the control box was located in the left drawer of the desk which was a part of every workstation.
ReplyDeleteBarry, that's fascinating, thank you for sharing! So, if I follow this correctly, the "terminal-in-a-desk" model shown here https://bit.ly/2Kuig5Z has the upper left drawer full of the system boards?
Delete